Love this bit from the James River Park System draft Master Plan:

The consensus is that the JRPS should not and will not be building additional roads and parking lots to solve the growing access challenges on site, as that necessarily degrades the conservation of the park proper.

Download the draft plan here and fill out survey (for as long as they’ll let you) here.